Bonum Certa Men Certa

Leaked: EPO Prioritises Work for Large Foreign Corporations, Discrimination Not Accidental But Centrally Planned

NASCAR sponsorsCorporate fast lane, like NASCAR sponsors

Summary: Canon, Philips, Microsoft, Qualcomm, BASF, Bayer, Samsung, Huawei, Siemens, Ericsson and Fujitsu receive V.I.P. treatment from the EPO, despite most of them not even being European

HOW can an outsider tell that the EPO operates like a business rather than a public service (to Europeans)? It's simple. Just watch how, as a matter of policy (i.e. coming from above), the EPO is tossing aside patent applications of small European companies and instead researching, under pressure and in a rush (hence unlikely to find adequate prior art) for large foreign corporations, probably resulting in the granting of poor patents, due to notoriously overzealous bossing and work-induced pressure (examiners rewarded based on the wrong yardsticks) and secret corporate partnerships. It's just wrong and it creates a toxic work environment with false goals. As the EPO is supposed to be transparent (considering the consent allegedly given by the public), we believe that the information below must be in the public domain. It compromises nobody except entities that selfishly collude.



Watch the following leaked memo. Is this the spirit of science or of business?

Memo: Closer Contact with Major Applicants



J.Scott

16/02/2015

Why is closer contact with major applicants desirable?



Both The President and VP1 have expressed the opinion that there needs to be closer contact between examiners and their applicants. We should foster a better esprit de service, not least to ensure that we do not lose workload market share to other major offices.

History



Historically, DG1 has had frequent contacts with applicants but no systematic way of approaching them or feeding back business intelligence obtained from them. Moreover, DG1 has not always passed on consistent messages to them.

Microsoft, Canon, Siemens



The ICT cluster has had close contact with both Canon and Microsoft recently and their experience has prompted the proposal for this pilot. Microsoft had 450 files which they regarded as “stalled” within the EPO. Under the auspices of Grant Philpott, Francesco Zacca and the PA KAM, together, they have found a mutually acceptable way to treat these files. Similarly Canon had a list of files which they considered excessively delayed. However, again with Grant Philpott supervising, Franco Cordera and PA KAM have started working on the first list of around 170 files. In JC EET, Jeremy Scott has initialised general and specific lectures from Siemens, their global patent strategy and specific training to examiners working in the fields of Sub-sea Connectors and Wind Turbines. At the same time, informal checks were made about what Siemens thought of the EPO way of handling their files. These are concrete ways in which the EPO’s major applicants are being facilitated through issues due to concrete contact with DG1 PDs and directors.

Proposed Pilot



It is proposed to start a pilot for ten major applicants, worldwide, lasting one year (1.4.2015-1.4.2016). The applicants will be selected by DG1 but taking into consideration input from PA, PDQM and DG5. This will be based around strong existing contacts. 5 liaison directors will be selected to deal with two major applicants each. They will be in regular contact with these applicants and will have at least one face to face meeting during the year of the pilot.

Liaison with DG2 and DG5



Patent Administration will be an integral player in this pilot project and close links to the Key Account Managers will be needed. To facilitate this PD PA will be kept fully in the loop. DG5 has been approached and informed. They will be present in the kick off meeting for the contact directors.

Benefits for DG1



This pilot will bring significant benefits to DG1: - more efficient use of missions - technical training - predicting incoming workload - targeting recruitment to the right areas - dealing with file requests such as PACE/late files - esprit de service - production

Optimising Missions



Historically missions were organised on a directorate and cluster level with little coordination beyond that. Moreover, they did not always target he largest applicants, but more often the “nicer” locations. With the deployment of the Coordination Tool for External Contacts and with more directional input from the PDs, along with the experience from the liaison directors it is guaranteed that DG1 missions will be more focussed on our major applicants and delivering a better service to them.

The Coordination Tool for External Contacts



The coordination tool can provide a good starting point for coordinating this pilot. For example there can be a link with the highlighted companies so that anyone wishing to visit should first contact the liaison director to a). see if the visit can go ahead; b). check what messages should be passed or if the applicant has specific issues; c). provide a place to feedback any business intelligence gathered on the mission.

Organisational Structure



It is envisaged that there will be 5 DG1 directors, each in contact with 2 major applicants. These directors will also work closely with the appropriate KAMs. The ERG should nominate someone to oversee the whole structure, to help with harmonisation of what is done, sharing of knowledge and best practice, and to make sure everything runs smoothly. Currently it is proposed that Jeremy Scott takes on this role. He would additionally sit on the ICT group, set up by Grant Philpott in this role.

Selected Directors and Companies



Canon (22) F.Cordera Philips (3) F.Cordera Microsoft (28) C.Platzer Qualcomm (9) F.Zacca BASF (5) M.Weaver Bayer (16) M.Weaver Samsung (1) under discussion Huawei (11) under discussion Siemens (2) J.Scott Ericsson (10) F.Zacca Fujitsu (20)

As can be seen, the applicants selected are major ones (their ranking in terms of applications filed in 2013 is parenthesised). The lowest applicant selected, Microsoft, filed 600 applications. All in the top 12 file over 1000 and Samsung filed 2833 applications in 2013. These applicants come from different technical areas and different geographical locations to maximise the learning potential of the pilot. It can be explored as to what the EPO can do for them and vice versa. Many of these applicants have been chosen because of the strength of existing contacts, which will facilitate the speedy implementation of the pilot.

Upscaling the Pilot



If the pilot is deemed successful, the idea would be to upscale the pilot to more companies in the second half 2016. The speed at which this would be done is determined mainly by the manpower PA requires to deal with the requests.

Further Contacts/Approval



To carry out this pilot, approval is sought from VP1.


If this whole spiel sounds too familiar, perhaps it should. We wrote about this before and commented on it, explaining why this is inherently corrupt. Microsoft, as it turns out, is one among several such partners -- something which Florian Müller, who had worked for Microsoft, publicly told us about.

Don't let the EPO's reputation be tarnished by managers who treat it like a monopolies 'meat market', where 'meat' is sold to the highest bidder.

Stay tuned as we have a lot more to come this week. We are going to assemble pieces of some other puzzles which help show just how rotten the EPO became under Battistelli's merciless reign. Demonstrations (to be staged by staff of the EPO, as the European public is still largely uninformed) are only days away and we have more stuff to share than we can publish in just a couple of days. If any of our readers possesses additional material that they can share, please send it anonymously. In our 9-year history we never compromised a single source.

Recent Techrights' Posts

Gemini Links 11/01/2026: Scott Morgan and 'The Unix Way'
Links for the day
IBM to Be 'Reorganised'
The rich look for ways to 'monetise' what's left IBM
Dr. Andy Farnell Explains Why He'll Stop Sending E-mail to Microsoft and Gmail Users
The article is long and well worth reading
 
IBM SkillsBuild as Microsoft Training, Microsoft Vendor Lock-in, Microsoft Surveillance
Microsoft benefits from IBM's "training"
EPO People Power - Part XXXI - Almost No Crime is Possible Without Enablers and Complicit Colleagues
By the middle of January 2026 we'll have taken things up another gear
Aruba's GNU/Linux Adoption Seems to Have Reach All-Time High This Year
ChromeOS rose by a lot too
After the LLM Slop Frenzy...
In every way, slop is no better than spam
Links 11/01/2026: 'Nothing to Lose' in Iran and Kyiv Restores Electricity
Links for the day
Gemini Links 11/01/2026: "Late To The Party" and "Thinking About Software Licences"
Links for the day
Links 11/01/2026: Bob Weir and Stewart Cheifet Perish
Links for the day
Higher Adoption Rates of GNU/Linux in Cyprus in Recent Years
there are some Cypriots who are championing Free software
Microsoft's linkedin.com is Shrinking, Expect LinkedIn Layoffs to Carry on in 2026
Expect the mass layoffs and office closures to carry on there, maybe as early as next week
Over at Tux Machines...
GNU/Linux news for the past day
IRC Proceedings: Saturday, January 10, 2026
IRC logs for Saturday, January 10, 2026
Monday, January 12, Red Hat Layoffs Allegedly Planned
We'll update this post or follow up if or when we get more information
Slop Still Becoming Rare as Another Week Ends
Generally speaking, calm and quiet is desirable, it's what we hope for (an absence of slop, a lack of need to keep abreast of it, ultimately)
Links 10/01/2026: Iran Offline, Venezuelans Decry Civilian Casualties
Links for the day
GAFAM Wants War
Go war! Go bailouts! Go debt! Go Wall Street!
GNOME Foundation's Microsoft Developer Account
"Lately they're teaming up with Mozilla to eliminate middle click paste - something which I use continuously."
GNU/Linux and Chromebooks Rose to Almost 10% in Haiti
What's noteworthy is that this month GNU/Linux is measured at around 8% and ChromeOS at about 2%
Links 10/01/2026: "Abolish ICE or GTFO", Calls to Ban X/Twitter From Apple/Google App Stores (or Implement National Blocks) Over MElon Turning It Into Non-consensual Deepfake Porn Site
Links for the day
EPO People Power - Part XXX - New Year Starts, Cocainegate Still Discussed a Lot, António Campinos Desperate for Distraction From It
Why the sudden change or 'generosity'? [...] Actual cocaine addicts caused nervous breakdowns among sober people
2026 Might be the Year Microsoft Replaces Layoffs With Mass Firings (No Severance Payments to Dismissed Staff)
It's hard to "see" PIPs unless insiders blow the whistle
IBM and Microsoft Hiding Layoffs in Similar, Overlapping Ways
Performance Improvement Plans aplenty
IBM is a Cancer That Attaches Itself to Everything
Red Hat should have remained an independent company
Links 10/01/2026: STV Layoffs (Scottish TV), “CBS Evening News” in Chaos (Culls and Censorship by the US Regime)
Links for the day
Over at Tux Machines...
GNU/Linux news for the past day
IRC Proceedings: Friday, January 09, 2026
IRC logs for Friday, January 09, 2026
Gemini Links 10/01/2026: Blackout, E-Waste, and Secondary Smartphone
Links for the day
Plot Twist: Microsoft MSN Relays Articles Hinting at or Pointing to Mass Layoffs Soon, Other Gossip
the narrative from Microsoft's "PR bunny" (Shaw) is showing mold already
Links 09/01/2026: Google and Character.AI Implicitly Accept Chatbots Kill Kids and GLP-1 ‘Slimming Pens’ Turn Out to be a Lot Worse Than Advertised
Links for the day
'Vibe Coding' is Not "AI", It's a Sewer, It is Junk
Linus Torvalds was wrong. 'Vibe coding' isn't good for anything.
GNU/Linux May be Approaching 10% "Market Share" in Montenegro
The surge started around 2021
At IBM, "Employee Reviews" (or Appraisals in the UK) Are a "Trojan Horse" for RAs (Mass Layoffs), a Waste of Time
comments from IBMer serve to suggest that appraisals can be precursors
Links 09/01/2026: Technical Blogging Lessons Learned and Google's Gmail Getting a Lot Worse
Links for the day
More IBM Layoffs in India
If IBM cannot afford to retain workers in India, then something is truly "out of control" at IBM
Escaping GAFAM Colonialism Requires Homegrown Free Software
GNU/Linux now measured at 3% in Zambia
Dr. Richard Stallman Has Done No Harm to the GNU Project or the FSF (He Had Benefited Both, Always, Even After the Attacks on Him Began)
Some people try to prevent Dr. Stallman from speaking or having a platform where many people can hear him
GNU/Linux at 4% in Saudi Arabia, Says statCounter
Some years ago Windows fell to a "market share" of just 11% there
Microsoft Isn't Denying the Mass Layoffs
Still silence from Microsoft
In Western Africa GNU/Linux Flirts With 5% Market Share
there's a gradual increase in GNU/Linux usage there
Gemini Links 09/01/2026: Pro1 X Repair and the Mercury Protocol
Links for the day
Links 09/01/2026: Cambodia and China Extradition, "NATO’s High-risk Patrols Near Ukraine"
Links for the day
No, Microsoft Did Not Deny the Q1 Mass Layoffs (Microsoft Can Delay These)
Maybe they disperse or delay the layoffs (changing plans), but the layoffs are going to happen
Only One Person in Charge of Fedora is Not IBM Staff
This is not a community project, it's just a way for IBM to onboard unpaid volunteers
This Is Not a Drill, GNU/Linux is Really Going 'Mainstream' on Laptops (and Desktops)
It is important to explain to people software freedom
IBM Albany Layoffs
not only did many in the site lose their job; there's more to come "and likely another one in February" (weeks from now)
EPO Workers' Industrial Action to Include Many Strikes, to Last Several Months
In some ways, The Hague and Bavaria are becoming almost indistinguishable from Moscow
EPO People Power - Part XXIX - Getting DER SPIEGEL, FAZ, Deutschlandfunk and Sueddeutsche Zeitung (SZ) to Cover EPO Scandals
We kindly ask our readers to contact their local media and urge it to cover the scandals
Over at Tux Machines...
GNU/Linux news for the past day
IRC Proceedings: Thursday, January 08, 2026
IRC logs for Thursday, January 08, 2026